Free Team Utilization Calculator
Compare committed project hours with available hours and identify spare capacity or overbooking.
Updated
What does this calculator do?
Calculate your result
Free · No account requiredYour entries stay in this browser session. Download or copy anything you want to keep.
Formula or structure
Utilization = committed / available × 100; remaining capacity = available − committed
Worked example
120 committed hours ÷ 160 available hours = 75% utilization, with 40 hours unallocated.
How to use it
- Read the field descriptions and use one consistent set of units.
- Enter your own figures or select Load example to inspect a worked scenario.
- Review the result alongside the assumptions below.
- Copy or download the output, then assign the next action in your planning workflow.
Assumptions and interpretation
More than 100% indicates overbooking. A utilization rate alone does not measure productivity, quality or individual effort.
Read the practical guideQuestions about this tool
How does the team utilization calculator work?
Do I need an account to use this tool?
Are my inputs uploaded or saved?
Related tools
Sprint Capacity Calculator
Estimate available team hours after leave and focus allocation before committing to sprint work.
ExploreMeeting Cost Calculator
Estimate the staff-time cost of a meeting using attendee count, duration and a loaded hourly cost.
ExplorePERT Estimate Calculator
Combine optimistic, most likely and pessimistic estimates into a weighted planning estimate.
ExploreTurn the plan into shared work
Give each next action an owner, a completion condition and a realistic date. My First Task brings tasks, boards, project workflows and issue tracking into one workspace.